HOME/SHIPPING & DELIVERY
GLOBAL FULFILLMENT & LOGISTICS

Production Time and Transit Time are Separate Commitments

Every custom wheel project should state where factory production responsibility ends, which Incoterm applies, and what delivery timeline to anticipate from our Chengdu export hub to your doorstep.

OFFICIAL LEAD TIME TRIGGER

When Does Production Time Officially Start?

Factory production scheduling begins on the next business day after three specific milestones are locked in writing:

GATE 01

Production Deposit Received

Bank wire or verified commercial remittance confirmed.

GATE 02

Written 2D/3D CAD Drawing Sign-Off

Client approves ET, PCD, CB, backspacing, and spoke concavity.

GATE 03

Finish & Hardware Details Locked

Coating color, gloss level, center cap, and packaging finalized.

MANUFACTURING WINDOWS

Estimated Production Lead Times

Real manufacturing timelines derived from actual factory cutting, hand-finishing, and CMM inspection records.

FASTEST ROUTE

Monoblock Forged

15–20 Business Days

Single-billet 6061-T6 machining, single-stage heat treat, lathe turning, 5-axis milling, and powder finishing.

Standard Factory Turnaround
MODULAR

2-Piece Modular

35–45 Business Days

Separate forged center disk machining, spun barrel prep, two-tone finishing, assembly hardware torqueing, and perimeter seal curing.

Standard Factory Turnaround
BESPOKE

3-Piece Specialist

50–60 Business Days

Outer lip polishing, inner barrel coating, center machining, titanium hardware installation, and pressure leak testing.

Standard Factory Turnaround
MATCHED 6-SET

Forged Dually (DRW 6-Set)

25–35 Business Days

Complete 6-wheel matched set engineering (2 fronts, 2 rear outers, 2 rear inners) with direct 8/10-lug CNC drilling.

Standard Factory Turnaround
TRANSIT MODES

International Freight Services & Transit Times

We coordinate transparent air and ocean shipping quotes tailored to project volume and destination logistics.

Air Express Door-to-Door

5–8 Business Days
Carriers & Scope

FedEx International Priority · DHL Express · UPS Worldwide Saver

Urgent individual car builds, dealer demo sample sets, and high-priority customer projects.

Door-to-Door DDP Available

Air Cargo (Airport-to-Airport)

7–12 Business Days
Carriers & Scope

Direct Cargo Airline Flight Charters

Medium-volume orders (4–12 wheel sets) requiring rapid arrival with local customs clearance broker.

Door-to-Door DDP Available

Ocean Container Freight

25–35 Calendar Days
Carriers & Scope

FCL (Full Container Load) · LCL Palletized Sea Cargo

Wholesale distributor inventory, container orders, and private-label brand production stock.

Door-to-Door DDP Available
EXPORT GRADE CRATING

Triple-Layer Protective Packaging

Exporting forged wheels across oceans requires zero compromise on packaging. Every BOYAO wheel is secured with three independent protective barriers before boxing:

  • 1High-Density Polymer Rim Edge Rings: Snap onto outer and inner wheel lips to absorb edge drop impacts during transit.
  • 2Elastic Face Shower Cap & Non-Woven Wrap: Shields hand-brushed or high-polish finishes from abrasive dust and micro-scratches.
  • 3Reinforced 5-Ply Corrugated Double-Wall Cartons: Heavy burst-resistant outer export cartons, strapped and shrink-wrapped on pallets for container orders.
Wheel Packaging Protection
Palletized Export Dispatch
DELIVERY AUDIT

4-Step Delivery Receipt Protocol

Following this simple check prevents transit claim disputes and guarantees rapid resolution.

STEP 01

Count Cartons & Match Labels

Verify that carton count matches the packing list. Ensure tracking numbers and position labels (Front / Rear) match your invoice.

✓ Required Action
STEP 02

Photograph Visible Exterior Damage

If any outer box is punctured, crushed, or water-damaged, immediately photograph all angles before cutting factory box tape.

✓ Required Action
STEP 03

Carrier Driver Damage Notation

Have the courier or freight driver officially log 'Damaged Box' on their delivery manifest or electronic signature pad before signing.

✓ Required Action
STEP 04

Inspect Wheels Prior to Tire Mounting

Dry-fit bare wheels on vehicle hubs. Never mount tires on a wheel with suspect transit damage, as mounting voids transit liability.

✓ Required Action
QUOTE DELIVERED PRICE

Need a Delivered Freight Quote?

Tell us your delivery country, city, and postal code. We will provide door-to-door air express or sea freight quotes with full customs clearance options.